Rough grading of landscape restoration areas
along Longvalley Road
·
Fine grading and topsoil installation along
Longvalley Road
·
Sod installation along Longvalley Road
·
Paving of asphalt surface layer along Longvalley
Road
·
Complete asphalt driveway restorations along
Longvalley Road
·
General site clean-up along Longvalley Road
·
General site clean-up at construction staging
area on east end of Longvalley Road
·
Roadway excavation and aggregate base course
installation along North Branch Road
·
Paving first layer of asphalt pavement along
North Branch Road
·
Installed first layer of asphalt driveway
restorations along North Branch Road
·
Concrete driveway restorations along North Branch
Road
·
Rough grading and topsoil installation along
North Branch Road
·
Adjusting manholes to proper elevation.
·
Work in preparation for paving asphalt surface
along North Branch Road
·
Nicor gas main and service replacements along
Longvalley Road and North Branch Road is now completed.
Work Anticipated to be completed next week, prior to
Thanksgiving Weekend
·
Install final layer and fine grading of topsoil
along North Branch Road
·
Sod installation along North Branch Road
·
Perform final testing of underground utilities
prior to asphalt paving of North Branch Road
·
Prepare for asphalt paving of surface layer
along North Branch Road
·
Application of oil (tack coat) and sand on
roadway prior to asphalt surface paving of North Branch Road
·
Pave surface layer of asphalt pavement on North
Branch Road
·
Complete asphalt driveway restorations along
North Branch Road
Work to complete project after Thanksgiving
Weekend
·
Complete sod restorations along North Branch
Road
·
Minor repairs along the project site
·
Perform final walk-through of project with
Village staff.
A letter has been delivered to those residents along
Longvalley Road with brick paver driveways stating those driveways can be
restored at this time. For those residents along North Branch Road, brick paver
restoration can be scheduled following the asphalt surface paving scheduled for
Tuesday, November 22nd.
Thanks again for all your patience and understanding
throughout the construction process. A significant amount of work has been
completed the past several weeks to get the project completed prior to the
Thanksgiving Weekend / end of the construction season.
Have a wonderful and enjoyable Thanksgiving!!!!