Friday, November 18, 2016

Paving to be Completed Prior to Thanksgiving!!!

Work Completed, November 4th to November 18th  
·         Rough grading of landscape restoration areas along Longvalley Road
·         Fine grading and topsoil installation along Longvalley Road
·         Sod installation along Longvalley Road
·         Paving of asphalt surface layer along Longvalley Road
·         Complete asphalt driveway restorations along Longvalley Road
·         General site clean-up along Longvalley Road
·         General site clean-up at construction staging area on east end of Longvalley Road
·         Roadway excavation and aggregate base course installation along North Branch Road
·         Paving first layer of asphalt pavement along North Branch Road
·         Installed first layer of asphalt driveway restorations along North Branch Road
·         Concrete driveway restorations along North Branch Road
·         Rough grading and topsoil installation along North Branch Road
·         Adjusting manholes to proper elevation.
·         Work in preparation for paving asphalt surface along North Branch Road
·         Nicor gas main and service replacements along Longvalley Road and North Branch Road is now completed.

Work Anticipated to be completed next week, prior to Thanksgiving Weekend
·         Install final layer and fine grading of topsoil along North Branch Road
·         Sod installation along North Branch Road
·         Perform final testing of underground utilities prior to asphalt paving of North Branch Road
·         Prepare for asphalt paving of surface layer along North Branch Road
·         Application of oil (tack coat) and sand on roadway prior to asphalt surface paving of North Branch Road
·         Pave surface layer of asphalt pavement on North Branch Road
·         Complete asphalt driveway restorations along North Branch Road 

Work to complete project after Thanksgiving Weekend
·         Complete sod restorations along North Branch Road
·         Minor repairs along the project site
·         Perform final walk-through of project with Village staff.

A letter has been delivered to those residents along Longvalley Road with brick paver driveways stating those driveways can be restored at this time. For those residents along North Branch Road, brick paver restoration can be scheduled following the asphalt surface paving scheduled for Tuesday, November 22nd.

Thanks again for all your patience and understanding throughout the construction process. A significant amount of work has been completed the past several weeks to get the project completed prior to the Thanksgiving Weekend / end of the construction season. 

Have a wonderful and enjoyable Thanksgiving!!!!