Monday, August 22, 2016

Water Improvements Nearly Complete, Storm Sewer Improvements to Begin on Longvalley Road

Work Completed Last Week, August 15th to August 19th
·         Performed testing and received required approvals to place the remaining portion of the newly installed water main along Longvalley Road into service.
·         Continued water service replacements along Longvalley Road.
·         Made connections to the existing water main at intersections of Crabtree Lane and Rio Vista Road.
·         Nicor Gas completed Phase I of the gas main and service replacements along North Branch Road and Longvalley Road from Country Lane to North Branch Road.

Work Anticipated to be completed This week, August 22nd to 26th  
·         Complete water service replacements along Longvalley Road between Country Lane and North Branch Road
·         Complete connections between the existing water main and the new water main at North Branch Road and Country Lane
·         Begin storm sewer installation along Longvalley Road from river working west.
·         Nicor has demobilized and will continue Phase II of the gas main and service replacement along Longvalley Road once the storm sewer work is completed.

The contractor will complete the water service replacements along Longvalley Road between Country Lane and North Branch Road this week. Water services will be replaced from the new water main to the existing valve and box located in front of each home. During the water service replacement, water to individual homes will be shut-off for approximately 2-3 hours while the transition from the old service to the new service is made. The contractor will notify each resident individually regarding the approximate time and day of the water shut-off prior to turning off the water.

The contractor will also make connections between the existing water main and the newly installed water main at Country Lane and North Branch Road. As with last week, during these connections, the existing and new water main will be need to shut-down. Residents affected by the shut-down are notified the day prior to the shut-down occurring.

A majority of the water system improvements along Longvalley Road will be completed near the middle of the week. The contractor will begin installing the new storm sewer starting at the river and working west.  A majority of the project will be receiving new, and larger, storm sewer piping.

Tuesday, August 16, 2016

Mainline Water Main along Longvalley Road Completed. Water Service Replacements On-Going

Work Completed Last Week, August 8th to August 12th  
·         Completed water main installing along Longvalley Road from river to North Branch Road
·         Performed tests and received required approvals to place a portion of the newly installed water main into service.
·         Began water service replacements along Longvalley Road starting at river and working west.
·         Nicor Gas continued to replace the existing gas main and services along North Branch Road and Longvalley Road.

Work Anticipated to be completed This week, August 15th to 19th
·         Continue to perform testing and receive necessary approvals prior to placing sections of the newly installed water main into service
·         Continue water service replacements along Longvalley Road at east end near river and work west to North Branch Road
·         Nicor gas is anticipating have the 1st Phase of gas main and service replacements, including house switch-overs, completed by the end of the week.

The contractor will continue water service replacements along Longvalley Road starting at the east end near the river and working west towards North Branch Road. Water services will be replaced from the new water main to the existing valve and box located in front of each home. During the water service replacement, water to individual homes will be shut-off for approximately 2-3 hours while the transition from the old service to the new service is made. The contractor will notify each resident individually regarding the approximate time and day of the water shut-off prior to turning off the water.

Monday, August 1, 2016

Water Main on Longvalley Road Continues

Work Completed Last Week, July 25th to July 29th  
·         Started water main installation along Longvalley Road at east end near river and worked west
·         Nicor Gas continued to replace the existing gas main and services along North Branch Road.

Work Anticipated to be completed This week, August 1st to August 5th  
·         Continue water main installation along Longvalley Road towards North Branch Road
·         Nicor Gas to begin work along Longvalley Road replacing the gas main and services in the area.

The contractor will continue with water main installation along Longvalley Road this week, with hopes of installing on the water main to North Branch Road by the end of the week. During water main installation, the contractor will be excavating along the entire length of the roadway in lieu of across the roadway. This will pose additional challenges in traveling along the roadway due to the construction equipment on-site and excavations on the side of the road. Also, those residents that live adjacent to where the working is occurring during the day, access to your driveway will be temporarily restricted as the excavation occurs in front of your driveway. Residents affected by temporary driveway closures will be notified by knocking on your doors and asking to move any vehicles from the driveway or garage prior to excavation occurring. We will do everything possible to limit the travel delays along Longvalley road, but please use care and allow a little extra time. The excavations will be filled at the end of each day, so access to all driveways and the roadway will be restored.

Due to the construction, an existing ComEd electrical line was hit causing a power-outage in the area. The incident is still under investigation regarding the reasons for the electrical line being hit. The good news is no injuries occurred on-site. We apologize for any inconvenience this interruption in electrical service caused.

Thanks again for all your patience and understanding as you live within a construction area.

Monday, July 25, 2016

Water Main on Longvalley Road to Begin

Work Completed Last Week, July 18th to July 22nd 
·         Completed sanitary sewer service replacements along Longvalley Road
·         Completed sanitary sewer pipe repairs as required along Longvalley Road
·         Completed sanitary sewer manhole replacements along Longvalley Road
·         Nicor Gas continued to replace the existing gas main and services along North Branch Road.

 Work Anticipated to be completed Next week, July 25th to July 29th 
·         Start water main installation along Longvalley Road starting at the east end near the river and working west to Rollwind Road
·         Nicor Gas continues to work along North Branch Road replacing the gas main and services in the area.

The contractor has completed a majority of the sanitary sewer system improvements and service replacements along Longvalley Road.  The contractor will begin installing the new 8-inch water main along Longvalley starting on the east end near the river and working west to Rollwind Road. In order to make a connection between the existing water main near the river and the new water main, the water main will need to be shut-down. The Village Water Department will provide notice to those residents affected by the shut-down the day prior to the work occurring.  Currently, the water main shut down is scheduled for Monday, July 25th. Resident affected will be notified on Friday, July 22nd.

As the water main construction begins, the contractor will be excavating along the entire length of the roadway in lieu of across the roadway. This will pose additional challenges in traveling along the roadway due to the construction equipment on-site and excavations on the side of the road. Also, those residents that live adjacent to where the working is occurring during the day, access to your driveway will be temporarily restricted as the excavation occurs in front of your driveway. Residents affected by temporary driveway closures will be notified by knocking on your doors and asking to move any vehicles from the driveway or garage prior to excavation occurring. We will do everything possible to limit the travel delays along Longvalley road, but please use care and allow a little extra time. The excavations will be filled at the end of each day, so access to all driveways and the roadway will be restored.

Thanks again for all your patience as the water main work begins with the inconveniences of increased travel delays and disruptions to your water service.

Friday, July 15, 2016

Sanitary Sewer Improvements Continue

Work Completed Last Week, July 11th to July 15th
·         Continued with sanitary sewer service replacements along Longvalley Road

Work Anticipated to be completed Next week, July 18th to July 22nd
·         Continue with sanitary sewer service replacements along Longvalley Road
·         Perform sanitary sewer pipe repairs as required.
·         Perform sanitary sewer manhole replacements

The contractor will continue with sanitary sewer service replacements, manhole replacements, and mainline repairs for the upcoming week.

Nicor Gas will begin gas main and service replacements next week along North Branch Road.

Thanks again for all your patience and understanding during the construction project.

Tuesday, July 12, 2016

Sanitary Sewer Improvements Continue

Work Completed Last Week, July 4th to July 8th
·         Grind-in-place of the existing roadway along Longvalley Road from Country Lane to east cul-de-sac
·         Product deliveries
·         Mobilization of equipment
·         Completed sanitary sewer manhole replacements along Longvalley Road

 Work Anticipated to be completed This week, July 11th to July 15th
·         Continue with Sanitary Sewer Service Replacements along Longvalley Road

Major construction has started along the project site with the start of sanitary sewer manhole replacements, sanitary sewer service replacements, and grinding-in-place of the roadway along Longvalley Road from Country Lane to the east end of Longvalley Road.

Thanks again for your patience and understanding as you begin to experience the inconveniences of living in a construction area.

Friday, July 1, 2016

Construction Starts July 5th

Work Completed Last Week, June 27th to July 1st  
·         Resident Preconstruction Meeting conducted on Monday, June 27th.  Thanks to all those who attended. Hopefully you found the information provided beneficial.

Work Anticipated to be completed Next week, July 4th to July 8th  
·         No work on-site July 4th
·         Grind-in-place of the existing roadway along Longvalley Road from Country Lane to east cul-de-sac
·         Product deliveries
·         Mobilization of equipment
·         Begin sanitary sewer service replacements as planned
·         Begin sanitary sewer manhole replacements as required
·         Perform sanitary sewer repairs as required

Major construction will begin this week. The contractor will grind-in-place the existing roadway on Tuesday, July 5th. This will allow the contractor to more easily excavate through the existing pavement and provide the temporary driving surface during the duration of the construction project until the new asphalt pavement is installed.

The contractor will then begin making the planned sanitary sewer service replacements, sanitary sewer manhole replacements, and sanitary sewer repairs. The contractor will begin along Longvalley Road at the easterly cul-de-sac and work west to Country Lane.

At this time, the existing pavement along the last block of Longvalley Road from Country Lane to North Branch Road as well as North Branch Road from Central Parkway to Country Lane will be left in-place. The contractor will focus their efforts along Longvalley Road prior to moving to North Branch Road.

The week of July 11th, Nicor Gas is anticipated to begin gas main replacement along North Branch Road.

As the construction project gets started, there will be various inconveniences that you will be experiencing including dust, rough roadways, travel delays due to construction traffic, and other general items. Please understand the Village will do everything possible to reduce these inconveniences to the greatest extent possible.

Thank you in advance as you deal with living in a construction area for the next several months. 

The contractor will not be on-site over the July 4th Holiday. Have a safe and enjoyable Holiday Weekend!!!